Start a shared line specification with one record per producer and pack. Ask for bottle drawings, closure examples, finished volume, labelled appearance and the requested weeks. Add the cleaning and first-article checks to each booking. A common technical sheet gives producers and operators the same basis for planning a campaign.
Give each producer a line in the planning matrix
| Field | Producer provides | Operator verifies |
|---|---|---|
| Bottle and closure | Bottle drawing, dimensions, closure and physical samples. | Shared or dedicated format parts, tested sample and changeover work. |
| Volume and booking | Target accepted bottles and preferred weeks. | Run time including restart, verification, breaks and cleanup. |
| Product handover | Product ID, lot and first-article criteria. | Recorded product path, changeover status and signed sample release. |
| Packaging logistics | Labels, cases, identifiers and any supplied pallets. | Delivery slot, space for empties, stock reconciliation and pallet collection. |
Distinguish a shared part from a shared production slot
Two producers may use bottles that use the same guides and still need separate artwork, a recipe change and its release checks. An illustrative run of 8,000 acceptable bottles at a demonstrated 2,000 acceptable bottles per running hour uses four running hours. Take account of the specific changeover, cleaning and material handover time before booking the slot. Avoid assigning one slot to two producers based on the line's nameplate speed.
The line purchasing article explains how to confirm supplied formats and the acceptance test once the shared specification is ready.
Share the producer matrix and the bottle samples already available.